Films and visuals that make megawatts feel real: for the operators, tenants and investors who commit years before the first hall is energized.
Tell us what you’re buildingThis industry sells the future with photos of the past. Construction drones and CAD screenshots don’t close a 300 MW lease.
MERIDIAN: 300 MW, master-planned to a gigawatt, 130 kW per rack, PUE 1.2, 2N. SOLARA. KEYSTONE: 600 MW, cold-climate. Engineered to spec, and every number in them is one we can defend.
Have a campus in planning? Send the project name or site plan. We’ll come back with the angle we’d take.
Send the campus



From these three documents to an investor-grade film in days, nothing else required from your team. We translate the engineering brief into a story, then validate every technical claim with your team before release.

Architecture, yard, substation: built from your drawings and passed through your engineering review before final.

No architecture yet? We propose the massing and make it look inevitable: investor-ready before the architect starts.

Four directions on the same volume before you spend on drawings. Decide early, on evidence.

Your drone footage of the dirt, the finished campus composited on top: matched sun, matched shadows.









Massing, single-line, site plan. NDA first if you want: most of our clients do.
48 hours later: treatment, shot list and the exact numbers we’ll pin to the architecture.
You approve frames before anything moves. Staged gates, no surprises.
4K film, still pack, cutdowns for the leasing deck and LinkedIn.
We work from your drawings and spec sheets, and renders pass your engineering review before final. Redundancy topology, cooling type, yard equipment: they match what you’re actually building.
Default, not exception. Codename handling, restricted team, no portfolio use without written release.
Yes, assets scoped to your calendar: land close, groundbreaking, topping out, energization. Each milestone gets its asset before the announcement, not after.
Enough to start. We propose massing and campus layout as a concept package; it upgrades to full accuracy when the architecture lands.
Structured rounds at layout, look and final. Design changes on your side re-enter at the right stage instead of restarting the clock.
You do. Full usage on delivery, no license meter running.
A data center is a building bought before it exists: and selling unbuilt buildings is the only thing we’ve ever done. 2,500 projects of pre-leasing imagery, investor decks and launch campaigns. The asset class changed; the job didn’t.
2N, PUE, kW per rack: no translation layer between your engineers and the film. Errors die in our review, not in your data room. Most studios can make it pretty; very few can make it pass a technical read.
Zero missed deadlines in 25 years: held by method, not heroics: staged gates, versioned models, assets scoped to your announcement calendar. Your groundbreaking won’t wait, and it won’t have to.
Provisual Operating System
What we built instead
We took what works from each and built one system where the parts are wired together. Your approved quote becomes the production plan. The plan opens your room. Your mark on a render becomes the artist’s task. The delivery closes the invoice.
Nothing is copied from one place to another, because there is no other place. That is the advantage: not a nicer render, a job that cannot quietly fall through the gap between two apps.
PRODUCTION · SAMPLE PROJECT11 / 11
| Input | KO | BL | R1 | R2 | R3 | FIN | |
|---|---|---|---|---|---|---|---|
| EXT-STILL-01-plaza (Plaza level) | Your OK | ||||||
| EXT-STILL-02-podium (Podium, dusk) | Your OK | ||||||
| EXT-STILL-03-skyline (Skyline, north) | Delivered | ||||||
| INT-STILL-04-lobby (Lobby) | R1 · due 04.09 | ||||||
| INT-STILL-05-sky-lounge (Sky lounge) | R1 · due 04.09 | ||||||
| INT-STILL-06-unit-a (Model unit A) | Blockout | ||||||
| ANIM-07-approach (Approach, 20s) | Blockout | ||||||
| EXT-STILL-08-aerial (Aerial, north-east) | Your OK | ||||||
| INT-STILL-09-fitness (Fitness) | R1 · due 04.09 | ||||||
| INT-STILL-10-pool-deck (Pool deck) | Blockout | ||||||
| ANIM-11-lobby-walk (Lobby walk, 15s) | Blockout |
REVIEW · R2 COLOR · V14 marks

STUDIO STATEsample
CLIENT ROOM · SAMPLEyour login
P2543 · in progress
Adamant Tower
Contracted scope
Exteriors, lobby and amenities · 11 pieces
PV-Q-2026-0117 · approved 12.05.26
Your contact at Provisual
Elena Ruiz · project manager
Project account
Recent activity
01
A project is not one deliverable: it is forty moving parts. Each one carries its stage, its due date and the person holding it. Cameras and architecture lock at blockout, so from there on a change is agreed and priced before it is done, never discovered on the invoice.
02
You draw straight on the render. The mark stays anchored to that frame and our answer stays attached to the mark, so nobody is hunting for the third one from the left in the email from Tuesday. Every round is versioned: what you asked, what changed and who signed off are still there six months later.
03
Every stage change, every handoff and every approval writes a line. Not for a report: so the answer to where your project stands takes four seconds instead of four emails. It is what turns twenty-five years without a missed deadline from a claim into something we can show you.
04
Your own room in our system: what you contracted, who your project manager is, what stage every piece is at, what has been invoiced and what is still open. The same numbers we run the studio on are the ones you see, from the day we start.
Tell us what you’re building. We’ll tell you how we’d sell it: and reply within four working hours.
info@provisualstudio.com